Drying-days estimator

Duration from conditions.

Rough structural drying duration from material, water category, and severity. Equipment stays until moisture goals are documented.

Inputs

Result

Estimated drying days
3 days
Estimate only — equipment stays until documented moisture goals are met (IICRC S500).